Did You Know?

If ye love me, keep my commandments. John 14:15 (KJV)

Determining Abib/Nisan 1

Estimated reading: 3 minutes 7 views

Determining Abib/Nisan 1

Determining Abib/Nisan 1

Read the original pages below, or open a page to enlarge it.

Determining Abib/Nisan 1 — study page 1
Page 1 · Open the original PDF to enlarge.
Read study text

DETERMINING ABIB/NISAN 1

THE THREE MAIN DETERMINING FACTORS FOR ABIB/NISAN 1 IN ORDER:

I. SPRING EQUINOX

II. NEW MOON III. BARLEY HARVEST

OTHER CONSIDERATIONS IN DETERMINING ABIB/NISAN 1

ABIB/NISAN 1 TYPICALLY FALLS BETWEEN MARCH 1ST AND APRIL 30TH

THE NEW MOON NEAREST TO APRIL 30TH AND ≤ APRIL 30TH DETERMINES ABIB/NISAN 1

ABIB 1/NISAN 1 + 20 DAYS [COUNT FROM ABIB/NISAN 1 TO PASSOVER & DAYS OF UNLEAVENED BREAD] MUST BE ≤ APRIL 30TH

LATEST ABIB/NISAN 30 ≤ MAY 09TH

EVIDENCE: BARLEY HARVEST – THE TIMING OF THE MONTHS OF THE BARLEY HARVEST FROM MARCH 1ST TO APRIL 30TH WHEN THE BARLEY IS FULLY RIPENED

SPRING EQUINOX [Created on Day 1 of creation]

EARLIEST NEW MOON

Gen 1:3-5

FOR DETERMINING

John 11:9 12 Hours daylight / 12 hours night

21 Days [inclusive of April 10th]

ABIB/NISAN 1

≥ MARCH 14TH MARCH 20TH

≥ MARCH 12TH

Count from Abib/Nisan 1 to Passover & Days of Unleavened Bread

Nisan 1 + 20 days must be ≤ April 30th

> 7 days before the

7 Days

Spring Equinox on

John 11:39 Jesus took 7 days to arrive at Bethany on Abib/Nisan 1

MARCH 1ST

March 20th

MARCH 31ST

APRIL 1ST

Sunset at 5:50 pm

APRIL 10TH

APRIL 30TH

New moon in March is > 7 days before the Spring

New moon in March is ≤ 7 days before the Spring

in Jerusalem

ABIB/NISAN 21 ≤ APRIL 30TH

Equinox on March 20th

Equinox on March 20th

Spring in Israel officially

LATEST NEW MOON FOR DETERMINING

– Spring ends on April 30th – Summer begins on May 1st

– If the new moon in March is > 7 days before the

begins around the Spring Equinox on

ABIB/NISAN 1

– If the new moon in March is ≤ 7 days before the

Spring Equinox on March 20th the next new moon in March or April after the Spring Equinox on March 20th will be considered .

Spring Equinox on March 20th consideration must be given to the next new moon in April after the Spring Equinox to ensure that this is the nearest new moon to April 30th but must be ≤ April 30th.

The new moon in April for determining Abib/Nisan 1 must be

March 20th

The full moon following after the new moon used

≤ April 10th

If the new moon in April used to determine Abib/Nisan 1

– If the new moon in March or April after the Spring

for determining Abib/ Nisan 1 must always be after the Spring Equinox

is > April 10th it cannot be used as the 21 days count

Equinox on March 20th + 20 days [21 days count from Abib/Nisan 1 to Passover & Days of Unleavened Bread] is > April 30th [the timing of the end of ripening of the barley harvest], then the new moon > 7 days before the Spring Equinox on March 20th will be Abib/Nisan 1.

– If the date of the new moon nearest to April 30th

from Abib/Nisan 1 to Passover & Days of Unleavened

+ 20 days [21 days count from Abib/Nisan 1 to Passover & Days of Unleavened Bread] is ≤ April 30th, then the new moon in April is chosen as Abib/Nisan 1.

Bread will be > April 30th

on March 20th

– If the new moon in April + 20 days [21 days count

from Abib/Nisan 1 to Passover & Days of Unleavened Bread] is > April 30th, Abib/Nisan 1 is on the new moon in March ≤ 7 days before the Spring Equinox.

Share this Doc

Determining Abib/Nisan 1

Or copy link

CONTENTS